Resources · Planning and specification
Commercial LED buyer guides
Updated
Choose fixtures, compare documented options and prepare a commercial lighting inquiry. These guides connect general planning methods to the product data we publish.
Tools
Use the high bay and warehouse lighting calculator from our planning tools for fixture count, approximate spacing and watts, with published model data and a photometric request handoff.
Choosing fixtures
Linear High Bay vs UFO: Choosing Warehouse Fixtures
Primary audience: Contractors
Compare UFO and linear high bays by ceiling height, aisle layout, optics, controls and published Allmax product data before specifying warehouse fixtures.
LED Wall Pack Buying Guide: Optics, Controls and Voltage
Primary audience: Contractors
Choose commercial wall packs by distribution, cutoff requirements, photocell options, mounting and input voltage using the published Allmax family pages.
LED Troffer vs Flat Panel: Commercial Ceiling Guide
Primary audience: Distributors and counter staff
Compare LED troffers and flat panels by ceiling fit, light distribution, CCT, dimming and emergency options using published TRF, AL-TRUF and MFP01 data.
Commercial Flood Light Buying Guide: Distribution and Aiming
Primary audience: Contractors
Choose commercial flood lights by target area, aiming, mounting, voltage and controls, with exact Allmax model links and a site-survey checklist.
Barn Lights and Dusk-to-Dawn Controls: A Trade Guide
Primary audience: Distributors and counter staff
Separate barn-light fixture selection from dusk-to-dawn controls, compare published BL02 models, and collect the documents needed for a commercial quote.
Lighting Spec Sheets and IES Files: Submittal Guide
Primary audience: Specifying engineers
Match cut sheets, IES photometric files and calculations to the selected lighting configuration, with an approved-equal and submittal checklist.
Occupancy Sensors, Photocells and LED Dimming
Primary audience: Contractors
Plan commercial lighting controls by occupancy, daylight, driver compatibility and commissioning, with exact Allmax control options and a project checklist.
Commercial Lighting CCT and CRI: Choosing Colour
Primary audience: Distributors and counter staff
Choose commercial LED colour temperature and CRI separately from light output, using task requirements, sample reviews and model-specific Allmax data.
Field-Selectable LED Wattage and CCT: Ordering Guide
Primary audience: Distributors and counter staff
Specify field-selectable LED wattage and CCT by exact model, then record output assumptions, driver options and installed settings for the facility team.
LED Wraparound vs Linear Strip: Commercial Selection
Primary audience: Distributors and counter staff
Compare commercial LED wraparound and linear strip fixtures by length, output, diffuser, mounting, voltage and controls using exact Allmax model data.
Retrofit & replacement
Commercial Lighting Retrofit Audit: A Sales Rep Checklist
Primary audience: Independent sales reps
Build a commercial lighting retrofit handoff with survey records, a fixture schedule, substitution checks, commissioning requirements and bid documents.
LED Retrofit Kits vs New Fixtures: What to Retain
Primary audience: Facility managers
Compare retained-housing retrofit kits with complete LED fixtures by condition, compatibility, access, controls and the documented Allmax product categories.
Commercial Retrofit Downlights: Housing and Controls
Primary audience: Contractors
Check commercial retrofit downlight housing fit, voltage, dimmer compatibility and ceiling conditions using the published Allmax 4-inch and 6-inch models.
Metal halide to LED replacement: sizing by lumens
Primary audience: Contractors
Published replacement statements and model-level lumen comparisons for planning a fixture change.
Codes, ratings & certifications
Vapor Tight Lighting: IP Ratings, Wet Areas and Cold Rooms
Primary audience: Facility managers
Understand vapor tight fixtures, IP65 and IP66, wet-location suitability and cold-room limits before selecting MVT04 lighting for a commercial project.
DLC Lighting and Utility Rebates: A Buyer’s Guide
Primary audience: Distributors and counter staff
Learn what DLC qualification means, how to check a model against utility rebate requirements, and which documents to request before ordering commercial LEDs.
120–277 V, 347 V and 480 V LED Fixtures Explained
Primary audience: Contractors
Compare commercial LED input-voltage ranges, driver options and controls, and find the Allmax model tables that publish 347 V or 480 V input.
Exit Signs and Emergency Lighting: Selection Checklist
Primary audience: Contractors
Compare exit signs, combo units, backup duration, mounting and environment, then prepare the emergency-lighting submittal before ordering.
Hazardous Location Lighting: Classifications and Evidence
Primary audience: Specifying engineers
Understand hazardous-area classifications, equipment evidence and missing product ratings before specifying lighting for a classified location.
Emergency Battery Drivers: Compatibility and Output
Primary audience: Contractors
Check emergency driver compatibility, battery temperature, emergency output and controls, with a contractor submittal and commissioning checklist.
LED Lifetime: L70, LM-80 and TM-21 Explained
Primary audience: Facility managers
Separate LED lumen-maintenance projections from fixture reliability, warranty and service planning, with a facility-manager evidence checklist.
BUG Ratings and Dark Sky Lighting: A Specifier’s Guide
Primary audience: Specifying engineers
Read BUG ratings, cutoff language and outdoor-lighting requirements, then match model evidence, mounting and controls to the site design.
Federal Lighting Documents: TAA, Buy American and BABA
Primary audience: Federal and institutional buyers
Distinguish federal lighting procurement requirements and assemble exact-item technical evidence, per-SKU letters and project-specific determinations.
480 V and 347 V fixture directory
Compare the published model rows for fixtures with higher-voltage input options.
Applications
Warehouse Lighting: Lumens, Foot-Candles and Fixture Count
Primary audience: Facility managers
Estimate warehouse fixture quantities with the foot-candle method, then check racks, task planes and photometric assumptions before ordering high bays.
Parking Lot LED Lighting: Choosing Shoebox Area Lights
Primary audience: Specifying engineers
Plan commercial parking lot lighting around pole positions, distribution, glare, voltage and mounting, with published AR07 data and a photometric RFQ checklist.
Canopy Lighting for Gas Stations and Parking Garages
Primary audience: Facility managers
Compare commercial canopy and garage lighting by geometry, glare, mounting, controls and access, with exact MGC01 and CSA03 product-family links.
High Bay Mounting Height: Output, Optics and Task Planes
Primary audience: Contractors
Plan high bay lighting using actual suspension height, task planes, optics and obstructions, with a fixture comparison and contractor handoff checklist.
Cold Storage Lighting: Temperature, Controls and Backup
Primary audience: Facility managers
Check cold-storage lighting against fixture temperature, battery limits, condensation, cleaning and service access before specifying a freezer installation.
Gymnasium Lighting: Glare, Court Layout and Controls
Primary audience: Facility managers
Plan gymnasium lighting around sports sight lines, court layouts, mounting, impact evidence and controls, with a facility-manager submittal checklist.
Browse commercial lighting applications
Explore warehouse and cold-storage lighting with links to the relevant product families.
Before you request a quote
Find published answers about samples, documents, voltages and ordering in our trade buyer FAQ. For a specific project, send the fixture schedule and required options through RFQ.
Next step
Price a job, or ask for the documents.
IES files and listing file numbers travel with the quotation.

