Allmax · Commercial LED
The lab is on this page.
The protocols we run on commercial SKUs, named — with the procedure and the conditions they run under. Raw data is available on request, not just claimed.
Every product passes the same four gates.
A later component or plant change is reviewed before production continues.
Engineering samples
Light output, electrical behavior and temperatures, measured against the specification.
Production-intent samples
Intended components and construction validated; applicable lab testing completed.
Pilot production
Assembly repeatability, line tests, inspection criteria and packaging checked.
Controlled release
Bill of materials, drawings, reference sample and documentation approved.
Origin is decided per order and stated in writing with the quotation.
Rain and wet-location test
Wet-location fixtures run under controlled water ingress to verify the wet-location behavior holds across the enclosure and the gasket line.
24-hour voltage burn-in
Burn-in runs at 110% of rated voltage for twenty-four hours, which surfaces early-life driver failures before the fixture leaves the floor.
Thermal cycling
Fixtures are thermally cycled to check the thermal design. The range depends on the product and is stated in the per-fixture report.
Photometric measurement
Raw photometric data is recorded, dated and versioned, and sent on request, rather than summarized into a marketing figure.
What a published protocol means
A protocol is published when the procedure, the conditions, and the dated report are all available to the person specifying the fixture. When a protocol changes, the document is versioned rather than quietly replaced — so a spec written last year can still be checked against the paperwork that backed it.
Per-fixture reports are sent directly on request.
Next step

